Repeat this basic pattern alternating shingles across the roof working toward the right side using the chalk line to keep the shingles straight horizontally.
Shingle roofing installation.
With most professional licensed insured roofing contractors the installation cost is usually about 60 of the total cost.
Use 4 nails per shingle and 6 nails on the prevailing windward sides of the roof as wind resistance nailing.
Pull the drip edge down about a half inch from that line to create a gap between the drip edge and the fascia board.
The installation assumes a single story house such as ranch cape or colonial with a hip and gable combination roof.
See below for a shopping list tools and steps subscr.
Using the chalk line snap a line between the two marks to get a straight edge.
Ask this old house general contractor tom silva reveals the best ways to secure shingles to a roof.
Many pros shingle in a vertical line up the roof because it s much faster.
Ashpalt shingle roofing installation labor basic basic labor to install asphalt shingle roof with favorable site conditions.
Install drip edge eave trim and valley flashing.
Complete shingle installation above the plumbing stack flashing.
Layout fabricate overlap and secure asphalt shingles per manufacturer instructions.
Flashing is placed around plumbing stacks and vents to help prevent leaks.
Browse owens corning roofing shingles by color shingle lines price features wind resistance and or warranty to find the right roof for your home.
Metal roof shingles shall be secured to the roof in accordance with this chapter and the approved manufacturer s installation instructions.
Roof valley flashing shall be of corrosion resistant metal of the same material as the roof covering or shall comply with the standards in table 905 10 3 1.
Known in the trade as vertical racking or staggering this how to lay shingles method enables the roofer to install a single column of shingles all the way to the peak without the wasted back and forth motion necessary to fill several rows of stair steps.
Butt a full shingle up against the cut shingle and nail into place.
Install roofing paper membrane.